Limbada & Limbada Consulting Engineers
Prefabricated Steel Structures
Description
M2
COST MRU ( Million )
Year
Chantier de Plaisanse at GRNW Phase 3 (30 & 22 m span)
2300
2.9
2006
Securicor Ltd. – Design of 30 m High Guyed Mast
2005
Chantier de Plaisanse at GRNW Phase 2 (36 m span)
1600
6
2004
Steel Mezzanine for Courts (Mtius) Ltd. at Riche Terre
890
4.1
2003
Atlas Communications Ltd. Checking Design of 36 m high Steel Towers
2002
6 Storeys Steel Tower for Detergents Ltd. at Plaine Lauzun
462
8
2002
Emtel Ltd. Checking Design / Drawings of Steel Towers10 m to 30 m High
1998
SEBNA Bottle Store at Riche Terre (24 m span).
1500
7
1995
Extension to Arvind Mills (Ex - Shape Fabrics) at La Tour Koenig (30 m span)
2500
16
1995
State Bank Headquarters at Port - Louis Composite concrete - steel frames spans varying from 9 to 12 m. In association with Campbell Reith Hill (U.K)
2000
800
1994
CMT Warehouse at Verdun. (25 m span)
3000
15
1994
Vacoas Fair. (Span varying from 10 to 15 m.)
3000
12
1992
Weaving Mill for Shape Fabrics at La Tour Koenig. (30 m span. Steel Portals)
6000
30
1990