Prefabricated Steel Structures

Description

M2

COST MRU ( Million )

Year

Chantier de Plaisanse at GRNW Phase 3 (30 & 22 m span)

2300

2.9

2006

Securicor Ltd. – Design of 30 m High Guyed Mast

2005

Chantier de Plaisanse at GRNW Phase 2 (36 m span)

1600

6

2004

Steel Mezzanine for Courts (Mtius) Ltd. at Riche Terre

890

4.1

2003

Atlas Communications Ltd. Checking Design of 36 m high Steel Towers

2002

6 Storeys Steel Tower for Detergents Ltd. at Plaine Lauzun

462

8

2002

Emtel Ltd. Checking Design / Drawings of Steel Towers10 m to 30 m High

1998

SEBNA Bottle Store at Riche Terre (24 m span).

1500

7

1995

Extension to Arvind Mills (Ex - Shape Fabrics) at La Tour Koenig (30 m span)

2500

16

1995

State Bank Headquarters at Port - Louis Composite concrete - steel frames spans varying from 9 to 12 m. In association with Campbell Reith Hill (U.K)

2000

800

1994

CMT Warehouse at Verdun. (25 m span)

3000

15

1994

Vacoas Fair. (Span varying from 10 to 15 m.)

3000

12

1992

Weaving Mill for Shape Fabrics at La Tour Koenig. (30 m span. Steel Portals)

6000

30

1990